Subscribe to a magazine

Install Snap Ring

Back to article View Gallery
16 of 24
With two bearings pressed into Lefty and the two large bearing bores sanded to size, it was time to set Lefty into its final location. Be sure to transfer the two location dowels from the "righty" case into the corresponding dowel holes in Lefty. Use a fresh gasket between Lefty and the rest of the case. Install the snap ring onto the output shaft's main bearing.

Advertisement