Subscribe to a magazine

Hose

Back to article View Gallery
15 of 19
16. When all the hose fittings are in place, it's time to begin the wiring. Here, the power lead attaches to the actuator control valve. As we mentioned in an earlier step, a second power lead is fed down the firewall and out the fenderwell to plug into the vacuum pump.

Advertisement