Subscribe to a magazine

Tacking

Back to article View Gallery
4 of 13
It's not a Ted Nugent zebra thing, but rather measurement markings off a known location on the frame rails for the swaybar links. Miller test-fit a couple locations for the swaybar end link mounts on the axle and the swaybar mount on the frame before finalizing this arrangement. Miller built some mounts with some 3/16-inch steel plate, a band saw, and a hole saw before tack-welding them into place.

Advertisement