Subscribe to a magazine

Front Cover Installation

Back to article View Gallery
8 of 15
Install the front cover and torque the bolts to 30lb-ft. Drop the spring and poppet ball into its bore and slide the front shift rail into the case. Use a flathead screwdriver to depress the poppet ball so the shift rail can go in. Once it's in, install the shift fork onto the rail and torque the set screw to 14lb-ft using some red Loctite.

Advertisement