Subscribe to a magazine

Door

Back to article View Gallery
13 of 15
11. The next part of the process requires that each spot-weld is drilled out between the inner and outer portion of the body from about the center of the door and the rear of the cut-in-half tub. A cut is required to remove the outer sheetmetal from the inner section as shown here.

Advertisement