Subscribe to a magazine

Roof Cover

Back to article View Gallery
5 of 15
The first step of the Stealth install is to remove the factory covers on the forward end of the roof tracks and slide the six Gobi "T" nuts into the tracks (three per side). The instructions include measurements as to where to position the "T" nuts. A rubber "T" nut pad is then placed on top of each "T" nut.

Advertisement