Subscribe to a magazine

Frame Rail Close Up

Back to article View Gallery
4 of 12
To install the CRC Link, secure the vehicle on a lift and remove the rear track bar. Next, the driver-side frame rail must be prepared for the new CRC Link bracket. To do so, the factory wire loom was removed from the frame to expose the middle mounting hole for the bracket. With the wire loom temporarily removed from the area, two existing frame holes could be enlarged to accommodate 9⁄16-inch mounting bolts. The bracket uses three Grade-8 bolts. One bolt hole is pre-existing on all JK frames.

Advertisement