Subscribe to a magazine

Wrench

Back to article View Gallery
6 of 14
A mere 28 days before the date of departure for Ouray, Colorado (see "The Trip That Never Was," page 78), I got to spinning wrenches. First on the to-do list was rebuilding the factory driveshafts with new NAPA heavy-duty U-joints. In all, the buildup consumed about 25 trips and $1,500 at the local NAPA.

Advertisement