Installing Flex
10: Install the new subframe rails using six flat Allen bolts. These bolts will drive directly through the new subframe rails and into the factory mounting holes in the frame that was used for the factory skidplate. Once mounted, mark the areas of contact on both the frame and the subframe with a marker, then remove the subframe and grind the marked areas of the tops of the subframe and frame to remove paint and foreign material in preparation for welding.
View Related Article
|
|